0800 043 4224

Asbestos Surveys Quote

Fill in the form below for an accurate Asbestos Report Survey on your property. You will be contacted quickly with a survey quotation by one of our local experienced independent surveyors and you're under no obligation.

If you would rather talk to an expert directly call: 0800 043 4224


For free asbestos surveys quote, please use the form below:

It is important that the correct type of asbestos survey is carried out on your property; there are two types of survey available...


A management survey is the standard survey. Its purpose is to locate, as far as reasonably practicable, the presence and extent of any suspect Asbestos Containing Material (ACM) in the building which could be damaged or disturbed during normal occupancy, including foreseeable maintenance and installation, and to assess their condition.

Management surveys will often involve minor intrusive work and some disturbance. The extent of intrusion will vary between premises and depend on what is reasonably practicable for individual properties, i.e. it will depend on factors such as the type of building, the nature of construction, accessibility etc.

A management survey should include an assessment of the condition of the various ACM's and their ability to release asbestos fibres into the air if they are disturbed in some way. This material assessment will give a good initial guide to the priority for managing ACM's, as it will identify the materials, which will most readily release airborne fibres if they are disturbed.

The survey will usually involve sampling and analysis to confirm the presence or absence of ACM's. However a management survey can also involve presuming the presence or absence of asbestos. A management survey can be completed using a combination of sampling ACM's and presuming ACM's or, indeed, just presuming.


A refurbishment and demolition survey is needed before any refurbishment or demolition work is carried out. This type of survey is used to locate and describe, as far as reasonably practicable, all ACM's in the area where the refurbishment work will take place or in the whole building if demolition is planned. The survey will be fully intrusive and involve destructive inspection, as necessary, to gain access to all areas, including those that may be difficult to reach. A refurbishment and demolition survey may also be required in other circumstances, e.g. when more intrusive maintenance and repair work will be carried out or for plant removal or dismantling.

There is a specific requirement in CAR 2006 (regulation 7) for all ACMs to be removed as far as reasonably practicable before major refurbishment or final demolition. Removing ACMs is also appropriate in other smaller refurbishment situations, which involve structural or layout changes to buildings (e.g. removal of partitions, walls, units etc). Under Construction, Design and Management (CMD) regulations, the survey information should be used to help in the tendering process for removal of ACM's from the building before work starts.

The asbestos survey report should be supplied by the client to designers and contractors who may be bidding for the work, so that the asbestos risks can be addressed. In this type of survey, where the asbestos is identified so that it can be removed (rather than to ‘manage’ it), the survey does not normally assess the condition of the asbestos, other than to indicate areas of damage or where additional asbestos debris may be present. However, where the asbestos removal may not take place for some time, the Asbestos Containing Materials' condition will need to be assessed and the materials managed.

Refurbishment and demolition surveys are intended to locate all the asbestos in the building (or the relevant part), as far as reasonably practicable. It is a disruptive and fully intrusive survey, which may need to penetrate all parts of the building structure. Aggressive inspection techniques will be needed to lift carpets and tiles, break through walls, ceilings, cladding and partitions, and open up floors. In these situations, controls should be put in place to prevent the spread of debris, which may include asbestos.

Refurbishment and demolition asbestos surveys should only be conducted in unoccupied areas to minimise risks to the public or employees on the premises. Ideally, the building should not be in service and all furnishings removed. For minor refurbishment, this would only apply to the room involved or even part of the room where the work is small and the room large.



Get An Asbestos Survey quote here